This posting has been archived
Layton Canal Culvert at Midland Drive, Roy City UT
- Bid Date
- Oct 28, 2021 at 01:30pm
- Owner
- City of Roy City
Description
The work is located near 4875 South Midland Drive, Roy City, Utah. The work generally consists of replacing an existing bridge across the Layton Canal with a 13' x 6' concrete box culvert with concrete inlet and outlet transitions. The work includes demolition of the existing bridge structure, approximately 120 feet of new storm drain pipe, roadway restoration, and all other related appurtenances and associated work as indicated in the Contract Documents. All work specified in the contract documents shall be completed by March 15, 2022
Bonds required.
Contact
- (801) 775-9191
CBS ID: 604684 | Published 10/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.