This posting has been archived
Residential Roof Repairs for Twenty (20) Houses, Macon, GA
- Owner Reference
- 22-023-NT
- Bid Date
- Nov 18, 2021 at 12:00pm
- Pre-Bid
- Mandatory - 10/27/2021 @ 10:00am @ (for location please or )
- Owner
- City of Macon & County of Bibb GA
- Trades
- Roofing Contractor , General Contractor GC
Description
1. Remove all roof covering material down to roof sheathing or furring strips. Remove all debris to legal dump site. Take precautions to protect plants, shrubs, trees, and fences from damage during removal. 2. Replace up to 30% of any rotten, badly warped, or broken roof decking and fasteners. Materials shall match remaining material as closely as possible. Call Program Administrator for compliance inspection. 3. Install 15 lb. asphalt saturated felt and new 220 lb. or heavier Class A three-tab fiberglass self-sealing strip shingles on top of roof decking using 8 nails per shingle. Install starter course at edges of roof. Shingles to have a 20-year limited manufacturer’s warranty. Install metal flashing tucked behind siding at intersections of roof and walls. Install galvanized metal flashing tucked securely and at least ½” into masonry units of chimneys. Program Administrator will select color. 4. Install continuous metal ridge vent along ridge lines of roof. Stop vents 18” from end of ridge line or from intersections of ridge lines. Make sure decking at ridge line is cut back at least 1” from edge of ridge pole so that the attic can ventilate. Minority Women Owned and other Disadvantaged Business Enterprises are encouraged to participate in the solicitation process. Additionally, respondents are encouraged to use M/W/DBE subcontractors where possible. All questions or concerns regarding the Bid should be made via email only. The Deadline for questions is November 12, 2021, at 5:00 PM EDT.
Bonds required.
Contact
- Nan Thorpe
- (478) 803-0536
- [email protected]
CBS ID: 604721 | Published 10/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.