This posting has been archived
Minter Bridge Pressure Reducing Valve Station Improvements, Hillsboro, OR
- Owner Reference
- 202110-10036
- Bid Date
- Nov 18, 2021 at 02:00pm
- Pre-Bid
- Recommended - 10/26/2021 @ 09:30am @ (for location please or )
- Owner
- City of Hillsboro OR
- Trades
- General Engineering Contractor GEC
Description
Work includes the removal of existing pressure reducing valve station (PRV) components including piping, fittings, valves, flow meters, pressure reducing valves and other items within an existing vault and replacement with new PRV station components as shown on the drawings. Work also include hatch replacements and structural improvements for the existing vault. Substantially complete March 24, 2022; final completions April 14, 2022
Contact
- Nesh Mucibabic
- 503.615.6541
- [email protected]
CBS ID: 605031 | Published 10/21/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.