This posting has been archived
Northeast Downtown Water Main Replacement, Phase I, Villa Rica, GA
- Bid Date
- Nov 30, 2021 at 10:00am
- Owner
- City of Villa Rica GA
- Trades
- Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, May Include Camera Inspections, General Engineering Contractor GEC
Description
Division A: Under this division, the Contractor must furnish the labor and materials (except for 10”, 8”, and 6” pipe, fire hydrants, and gate valves) necessary to install approximately 4,000 LF of 10” water main, 100 LF of 8” water main, 550 LF of 6” water main, and all valves, fittings, bores, service transfers and other appurtenances necessary for complete installation. See Division B scope for specifics of what materials the City shall provide. All other materials shall be provided by contractors for Division A. Division B: Under this division, the material supplier must furnish the following materials: 4,350 LF of 10” C-900 PVC water main, 120 LF of 8” C-900 PVC water main, 600 LF of 6” C-900 PVC water main, 7 fire hydrants, and 22 valves (size 6” – 10”). All other materials will be provided by the contractor for Division A. Time allotted for completion of work on Division A is 90 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in two (2) Contracts.
Bonds required.
Contact
- Pete Zorbanos
- (404) 360-9450
- [email protected]
CBS ID: 605073 | Published 10/22/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.