This posting has been archived
Woodville Hwy Bloxham Cutoff Water System Improvements, Tallahassee, FL
- Owner Reference
- IFB-006-22-RM
- Bid Date
- Dec 9, 2021 at 02:30PM
- Pre-Bid
- Mandatory - 11/10/2021 @ 02:00PM @ (for location please or )
- Owner
- City of Tallahassee FL
- Trades
- General Engineering Contractor GEC
Description
Work consist of furnishing all labor, equipment and materials for construction of approximately of 9,850 feet of new 8-inch water main on the south side of Bloxham Cutoff from Sam Smith to Woodville Highway and placing the existing 6” PVC out of service. Work also includes 27 residential water services, isolation valves, system tie-ins, fire hydrants, and 6 – 18” jack and bore roadway crossings. A detailed listing of pay items and quantities to be completed for this project is provide on the Bid Summary Sheets in the Proposal. This project has three (3) bid alternates. The City will select either Bid Alternate #1 (HDPE Pipe), Bid Alternate #2 (DIP Pipe) or Bid Alternate #3 (PVC Pipe) and once the option has been selected, award to the lowest bidder of the selected option (as long as the bidder meets all other requirements outlined in the bid documents).
Bonds required. Prevailing wages.
Contact
- Ron Mayo
- (850) 264-9407
- https://www.bidsync.com/bidsync-app-web/vendo
- [email protected]
CBS ID: 605085 | Published 10/22/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.