This posting has been archived
Street Rehabilitation FY 2022, Berkeley, CA
- Owner Reference
- 22-11470-C
- Bid Date
- Jan 6, 2022 at 02:00pm
- Estimate
- $5.07 million
- Owner
- City of Berkeley CA
- Trades
- General Engineering Contractor GEC
Description
Street Rehabilitation Work includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, valley gutters, drainage, crack sealing, base failure repairs, ARAM cape seal, cold planing, removal and disposal of pavement surfaces and base materials, stabilization, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, pavement markings, striping, markers, signage, and traffic loops as specified. See attached fotr specifics related to this and the intersection reconfiguartion at Dwight Way & California Street component of this project.
Bonds required. Prevailing wages.
Contact
- Wendy Wong
- (510) 981-6300
- [email protected]
CBS ID: 609439 | Published 11/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.