This posting has been archived
Pedestrian Path Improvements: Roberts Lane from Plymouth Ave to Frontier Dr, Bakersfield, CA
- Owner Reference
- 20114/3000-RC00132
- Bid Date
- Feb 2, 2022 at 11:00AM
- Pre-Bid
- Scheduled - 1/4/2022 @ 10:00am @ (for location please or )
- Estimate
- $809,347
- Owner
- County of Kern CA
- Trades
- A - General Engineering Contractor GEC, A - General Engineering Contractor GEC
Description
Constructing curbs and gutters, sidewalk, curb ramps, drive approaches and driveways, paving hot mix asphalt, painting traffic stripes and thermoplastic pavement marking, relocating roadside sign, reset gates, and reconstructing
fences. Project duration is 50 work days.
Bonds required. Prevailing wages.
Contact
- Diana Rodriguez
- (661) 862-8861
- (661) 862-8851
- [email protected]
CBS ID: 612233 | Published 12/22/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.