Napa Valley Vine Trail - St Helena to Calistoga, CA
- Owner Reference
- -Project No. 21-04 - Federal Project No. ATPL 6510(003)
- Bid Date
- Jan 31, 2022 at 02:00pm
- Pre-Bid
- Mandatory - 1/12/2022 @ 02:00PM @ (for location please or )
- Estimate
- $9,500,000
- Owner
- Napa Valley Transportation Authority
- Trades
- A - General Engineering Contractor GEC
Description
The work generally consists of the installation of a 7.4 milelong Class I bicycle and pedestrian path in the County of Napa from Pratt Avenue in St Helena to Fairway Drive Extension in the City of Calistoga. The majority of the path runs on the east side of State Route 29. This mixed-use facility consists primarily of a 10' wide asphalt concrete path with 2' shoulders, three bridges over Deconinck Wetland, Twomey Drainage and Napa River Crossing, installation of 2 new Pedestrian Hybrid Beacon (PHB) traffic signals, signage and striping, retaining walls, fencing, new drainage structure, biological mitigation, tree removal, landscaping and irrigation. Existing drainage features and patterns will remain along the extent of the project. The work must be completed within 240 working days. The site of the Work is located along the State Route 29 from Pratt Ave at St Helena to Lincoln Ave in Calistoga.
Bonds required. Prevailing wages.
Contact
- Renee Kulick
- (707) 259-8780
- [email protected]
CBS ID: 613163 | Published 1/3/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.