This posting has been archived
Sanger Sidewalk Gap Closure Project, Sanger, CA
- Owner Reference
- Fed Aid # CML-5197(031)
- Bid Date
- Apr 8, 2022 at 10:00am
- Owner
- City Of Sanger CA
- Trades
- A - General Engineering Contractor GEC
Description
The Federally funded work includes accessible concrete curb ramp and sidewalk improvements, as shown on the drawings and in the specifications, including the supplying of all labor, equipment, tools and materials required to make the work complete and operable and also the following: Contact the City of Sanger Public Works, Police and Fire Departments to inform them of the project schedule. Install traffic, dust, and erosion control measures in the areas of construction. Clear and grub the project area within the footprint indicated on the plans. Construct roadway and concrete improvements as indicated on the plans. Install signing and striping improvements/repair work as indicated on the plans or as necessary. Clean up the entire work area, remove traffic control and de-mobilize. The above is not all inclusive and the contractor is responsible for all other items shown on plans or listed in specifications. DBE goal is 10%.
Bonds required. Prevailing wages.
Contact
- Joshua D. Rogers
- (559) 244-3123
CBS ID: 620231 | Published 3/2/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.