Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#625555 Posted 4/15/2022

Arterial Roads Rehabilitation & Bicycle Lane Improvements Project, Elk Grove, CA

Owner Reference
WPR014 (Federal Project: 5479(060))
Bid Date
May 2, 2022 at 10:00AM
Pre-Bid
Scheduled - 4/12/2022 @ 10:00am @ (for location please or )
Estimate
$5,730,000
Owner
City of Elk Grove CA
Trades
A - General Engineering Contractor GEC

Description

The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include but not be limited to the following: provide roadway widening, resurfacing of existing pavement, and installation of Class II bike lanes along portions of Waterman Road between Bond Road and Grant Line Road and Elk Grove Florin Road between Elk Grove Boulevard. and Valley Oak Lane. The Project includes installation of ADA ramps, minor traffic signal Work, and installation of a mid-block crossing with a rectangular rapid flashing beacon (Work). Questions are due no later than 5:00 PM on April 22nd. Project duration is 140 working days. DBE Goal: 22%

Bonds required. Prevailing wages.

Contact

CBS ID: 625555 | Published 4/15/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.