Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#626261 Posted 4/20/2022

Fullerton Main Plant PFAS Water Treatment Plant, Anaheim, CA

Owner Reference
FUL-2022-1
Bid Date
Jun 2, 2022 at 02:00pm
Pre-Bid
Encouraged - 4/28/2022 @ 10:00am @ (for location please or )
Estimate
$6,500,000
Owner
Orange County Water District CA
Trades
A - General Engineering Contractor GEC

Description

The work includes but is not limited to the following: The Fullerton Main Plant PFAS Water Treatment Plant project generally consists of the following major components: Take delivery and install District furnished Dual Media Pressure Vessel systems at the Water Treatment Plant including pressure testing, disinfection, and bacteria testing. Take delivery and install District furnished Granular Activated Carbon (GAC) system media into dual media pressure vessels. Furnish and install a backwash system for the Granular Activated Carbon (GAC) system. Coordinate and assist with installation of District purchased media. Rehabilitation (redevelopment) of City water supply well number 3A. Furnish and install a new well pump and motor. Water Treatment Plant Structural Concrete: Construct structural concrete at the Fullerton Main Plant site for the PFAS Water Treatment Plant. Connect to the Water Treatment Plant and to the distribution system: Furnish and install epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipelines to the Granular Activated Carbon (GAC) system. Construct epoxy lined and coated above ground piping and epoxy lined and cement mortar coated (CMC) buried pipeline from the GAC system to the connection to the distribution system. Paving and Site Improvements: Grading, Asphalt Paving, and drainage at the new water treatment plant. Exterior Wall, gate, landscaping, and irrigation. Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the new water treatment plant. Instrumentation and control systems shall be coordinated with the City’s Controls Integrator. Provide all commissioning and start-up-services.

Bonds required. Prevailing wages.

Contact

CBS ID: 626261 | Published 4/20/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.