#627982 Posted 5/7/2022

Kruger Creek Stabilization, Tigard, OR

Owner Reference
2022-16, CIP 2022 – 94046
Bid Date
Jun 1, 2022 at 02:00pm
Estimate
$4.15M
Owner
City of Tigard OR
Trades
General Engineering Contractor GEC

Description

The project generally consists of the following (the Work): 1. Installation of approximately 1,300 linear feet of 24-inch and 30-inch storm drainage pipe by trenching. 2. Installation of approximately 175 linear feet of 28-inch storm drainage pipe by slip lining. 3. Installation of storm drainage structures 4. Erosion and sediment control with in-water work, general excavation and slope stabilization. 5. Installation of rock buttress slope stabilization. 6. Creek bed restoration and stream enhancement. 7. Installation of gabion mesh retaining wall. 8. Gravel maintenance road rehabilitation. 9. Tree and invasive species removal. 10. Clean Water Services vegetated corridor seeding, planting, surface restoration, and maintenance period. 11. All other work required by the construction plans and specifications to rehabilitate Kruger Creek and stabilize adjacent slopes.

Bonds required. Prevailing wages.

Contact

  • Toni Riccardi
  • 503-718-2518

CBS ID: 627982 | Published 5/7/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.