ID 628786
Archived
San Francisco County
Owner Reference: 0000006111
Bid Date: 06/15/2022 at 02:30PM
Pre-Bid: 05/24/2022
Stow Lake Boathouse parking lot located in Golden Gate Park at 50 Stow Lake Drive, San Francisco.
Estimate: $2,090,000
Trades: A - General Engineering Contractor GEC
This project primarily involves renovating and re-paving the pedestrian pathway around the perimeter of Stow Lake in Golden Gate Park located in San Francisco. This pedestrian pathway is one of the many features unique to the world-famous Golden Gate Park. This project will improve usability and accessibility of the existing asphalt pathway that is used and enjoyed by the public daily. Site improvements include but are not limited to demolition, grading, compaction, asphalt paving, concrete paving, refurbishing of existing site furnishings, installation of new site furnishings, signage. The perimeter path work around Stow Lake shall be completed in two separate construction phases to allow for public access to at least half of the perimeter path at all times. This project also includes repaving the existing asphalt parking lot at the Stow Lake Boathouse and re-paving an existing asphalt path at 36th Ave and Spreckels Lake Drive. 276 calendar days duration. 20% LBE paricipation and Good Faith Effort required. Bonds required. Prevailing wages.
City & County of San Francisco CA
Omar Davis
(628) 652-6644
Login or create an account To view email
Published 05/15/2022 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.