Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#632684 Posted 6/22/2022

Metropolitan Biosolids Center (MBC) Storm Water Diversion Project, San Diego, CA

Owner Reference
K-22-2096-DBB-3
Bid Date
Jul 20, 2022 at 02:00pm
Estimate
$6,900,000
Owner
City of San Diego CA
Trades
A - General Engineering Contractor GEC

Description

This contract will provide upgrades to the plant’s storm water drainage system to divert and contain an initial volume of storm water in a diversion structure and pump the retained storm water to the plant’s sanitary sewer system. This work shall consist of the following main tasks: Modification to the existing gravity storm drain system, addition of a new diversion structure (new construction) with pump station. Modifications to divert storm water from one drainage sub-basin to the plant’s 36-inch centrate pipe. The project includes ADA work and revegetation. Subcontracting participation requirements: 1. SLBE participation 2. ELBE participation 8.1% 14.2% 3. Total mandatory participation 7.2. 22.3% GFE Documentation required. Project duration is 300 working days (including 120 day plant period)

Bonds required. Prevailing wages.

Contact

CBS ID: 632684 | Published 6/22/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.