Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#638881 Posted 8/29/2022

Water System Improvements, Christmas Valley, OR

Bid Date
Sep 7, 2022 at 02:00pm
Owner
Christmas Valley Domestic Water Supply District OR
Trades
Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Video Camera Inspections, Boring and Drilling - General Engineering Contractor

Description

Generally, the work consists of installation of 8,329 lineal feet of 8" C900, 12,396 lineal feet of 6" C900, and 96 lineal feet of 4" C900, one bore, 13 fire hydrants, all necessary valves and fittings, generator installation, and other related work. The First-Tier Subcontractor Disclosure Form, which is submitted separately, is required at 4:00 PM on September 7, 2022. The bids shall be mailed or delivered; fax or email trans-missions will not be accepted.

Bonds required. Prevailing wages.

Contact

CBS ID: 638881 | Published 8/29/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.