Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#641571 Posted 9/21/2022

Fullerton Kimberly Well 1A - Well Rehabilitation, Fullerton, CA

Owner Reference
FUL-2022-2
Bid Date
Nov 1, 2022 at 02:00pm
Pre-Bid
Scheduled - 9/28/2022 @ 10:00am @ (for location please or )
Estimate
$2,000,000
Owner
Orange County Water District CA
Trades
A - General Engineering Contractor GEC

Description

The work includes but is not limited to the following: The Fullerton Well Kimberly 1A Well Rehabilitation project generally consists of the following major components. (1) Rehabilitation (redevelopment) of City water supply well number 1A. (2) Furnish and install a new well pump and motor. (3) Well 1A Structural Concrete: Construct structural concrete at the Kimberly Well 1A site for the new Well 1A well base. (4) Connect to the existing Water Treatment Plant: Furnish and install epoxy lined and coated above ground piping. (5) Paving and Site Improvements: Grading and Asphalt Paving at the Well 1A site. (6) Electrical and Instrumentation: Electrical equipment and facilities, and instrumentation equipment and facilities at the Well 1A site. Instrumentation and control systems shall be coordinated with the City’s Controls Integrator. (7) Provide all commissioning and start-up-services.

Bonds required. Prevailing wages.

Contact

CBS ID: 641571 | Published 9/21/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.