Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#641857 Posted 9/24/2022

Install Left-turn Lanes at Airport Way and Hazelton Avenue, Stockton CA

Owner Reference
WT19002_HSIPL-5008_184
Bid Date
Oct 13, 2022 at 02:00pm
Pre-Bid
Recommended - 10/4/2022 @ 10:00am @ (for location please or )
Estimate
$1.5 Million
Owner
City of Stockton CA
Trades
A - General Engineering Contractor GEC, C10 - Electrical Contractor - Lighting, Luminaires, High Voltage (HVE)

Description

Installation of left-turn lanes to the intersection of Airport Way/Hazelton Avenue, combined with associated signal modification and upgrades. In addition, add sidewalk to close gaps and improve acess for pedestrians on Airport Way along with curb and gutter improvements. Additionally, wheelchair ramp improvements would be installed at corners of the intersections of the surrounding street. Federally funded. DBE participatio requirements apply.

Bonds required. Prevailing wages.

Contact

CBS ID: 641857 | Published 9/24/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.