Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#646783 Posted 11/9/2022

Construction of Crosswalk Improvements, Kern Co., CA

Owner Reference
21138/3000-RC00116
Bid Date
Nov 30, 2022 at 11:00AM
Estimate
$1,341,900
Owner
County of Kern CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities, C8 - Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs, Driveways & Handicap ADA Ramps NIGP 913-47

Description

Construction of curb ramps, concrete sidewalks, cross drains, curbs, curb and gutter, drive approaches, asphalt tie-ins, painting traffic stripes and thermoplastic pavement markings, installing loop detectors, and installing retroreflective borders on existing signal heads at various signalized intersections throughout the County. Project duration is 90 calendar days. DBE Goal: 18%

Bonds required. Prevailing wages.

Contact

CBS ID: 646783 | Published 11/9/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.