#663565 Posted 3/23/2023

CMAR - Roberto P. Bustamante WWTP Expansion (RRBWWTP) GMP 1 - Digester & Early Site Mobilization, El Paso, TX

Bid Date
Apr 13, 2023 at 02:00pm
Pre-Bid
Encouraged - 3/30/2023 @ 10:00am @ (for location please or )
Owner
El Paso Water Utilities (EPWater) TX
Trades
At Risk Construction Management CMAR, General Engineering Contractor GEC; Subcontractor Opportunities

Description

Project Description: 1) Installation of one (1) new anaerobic digester including one (1) anaerobic digester radial beam floating gas-holder cover, one (1) linear motion mixer, cover appurtenances and associated digester gas safety equipment. 2) Installation of two (2) new digester waste gas burners, one (1) condensate vault with one (1) submersible sump pump, two (2) new pilot gas control panels and 16-inch low pressure digester gas (DG) pipeline from the anaerobic digesters to the waste gas burners. 3) Upgrades to the two (2) existing anerobic digester pump rooms including structural modifications, architectural improvements, demolition of existing process mechanical, HVAC, and plumbing equipment, installation of four (4) sludge heat exchangers (Tubein-Tube), four (4) horizontal recessed impeller sludge transfer pumps, eight (8) horizontal recessed impeller sludge recirculation pumps, and six (6) hot water secondary loop pumps inside the mechanical rooms. 4) Upgrades to three existing anerobic digesters including replacement of drain piping, level sensors, and digester gas collection piping and appurtenances on the pump room rooftops. 5) Installation of new pedestrian walkway on the existing pipe bridge between the anaerobic digester pump rooms. 6) Installation of one (1) new digester area electrical building including all new electrical gear, transformers, feeders, switchgear, controls, conduits, conductors to equipment, and HVAC. 7) Associated above grade and underground yard piping, civil/site, grading and paving. Yard piping includes connection of existing natural gas lines to new waste gas burners, digester gas condensate line, process drain lines including connection of new 12” drain line to the existing IPW pipeline. Two (2) new manholes will connect process drain lines from Digester Pump Room No. 2 (service Anaerobic Digesters No. 3 and 3) to the existing plant drain line. Installation of stone columns as a foundation for the digester structure. Questions are due no later than April 6, 2023.

Prevailing wages.

Contact

CBS ID: 663565 | Published 3/23/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.