Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#688405 Posted 11/14/2023

Retrofit of Swinging Bridge over Arroyo Grande Creek, Arroyo Grande, CA

Owner Reference
PW 2021-06, Fed #CPFCDS-5199(034)
Bid Date
Dec 14, 2023 at 02:00pm
Pre-Bid
Encouraged - 11/30/2023 @ 02:00pm @ (for location please or )
Estimate
$950,000
Owner
City of Arroyo Grande CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

Description

In general the project consists of retrofitting the existing suspension bridge by replacing the existing rod hangers with new cable hangers, replacement of the existing wind cables with new cables and helical anchors, strengthening the existing abutments, installation of new back span cables and helical anchors, cleaning and painting steel, disposing of lead paint, removal and replacement of wood members, and removal and repair of landscaping, decorative hardscape, curb and gutter, and HMA paving associated with the retrofit work, the installation of a composite lumber cap added to the top of the wood railing for the full length of each railing, and the installation of new chain link fabric. Contract time is established as 140 working days. Deadline for questions is December 1, 2023 by 4:00pm. DBE goal is 8%.

Bonds required. Prevailing wages.

Contact

CBS ID: 688405 | Published 11/14/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.