Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#697794 • Posted 2/20/2024

*Subcontractor Opportunities* 2024 Exterior Painting of Alisal Community School, Salinas, CA

Bid Date
Feb 28, 2024 at 02:00pm
Questions Due By
February 19, 2024 by 7:00pm
Pre-Bid
Pre-Bid Meeting Has Passed - 2/15/2024 @ 03:00pm @ (for location please or )
Owner
Alisal Unified School District CA
Trades
C33 - Painting Contractor: Exterior Finish, Decorating: Interior Wallpaper & Wall Coverings
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
July 26, 2024

Description

We are looking for a General Contractor and/or Painting Subcontractor to oversee, manage and/or self-perform as applicable the following tasks: Abatement: Abate any identified lead paint as noted in the Hazmat Report included in Appendix A. Paint exterior of buildings: Paint exterior stucco and portable buildings (including doors and trim) to have a consistent color scheme on each site. Retain and protect all existing murals in place. As part of surface preparation fill all cracks and holes. See paint specifications. Submit paint brush outs for approval prior to painting. Encapsulate areas where lead is identified present. Select and submit product data for proposed encapsulate material for approval. Prep surface per manufacturer’s recommendations. Prepare test patch to ensure compatibility with materials. The encapsulant must be capable of being applied safely and must not contain toxic substances. The encapsulant must adhere to existing paint films. The encapsulant must have the ability to remain intact for an extended period of time when exposed to the expected environmental conditions and use patterns. The encapsulant and its application procedure must comply with fire, health, and environmental regulations. Encapsulants must adhere to the existing paint film. Contractor to provide all necessary equipment, material and tools paint all areas of the buildings. Provide protection of areas around the buildings (i.e. pavement, landscaping, etc.). Alisal Community School Specifics: See drawings for painting scheme and colors. Scope includes Buildings D, K, J and Portables noted on plans. Building D needs to be repainted as noted on the drawings. Building K has a mural that needs to be retained and protected. Fremont Elementary School Specifics: See drawings. See drawings for painting scheme and colors. Scope includes Buildings R-1, R-3, R-4, 2, 6, Rooms 26, 27, 28, 30-33, 35 and restroom portable R-1 noted on plans.

Bonds required. Prevailing wages.

Contact

CBS ID: 697794 | Published 2/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.