Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#698717 Posted 2/27/2024

*Pre-Bid Rescheduled* *Subcontractor Opportunities* RE-BID Building 300 Modernization Project, Fairfield, CA

Bid Date
Mar 14, 2024 at 02:00pm
Questions Due By
February 29, 2024 by 2:00pm
Pre-Bid
Pre-Bid Meeting Has Passed - 2/22/2024 @ 11:00am @ (for location please or )
Owner
Solano Community College District CA
Trades
Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
April 22, 2024 – November 29, 2024

Description

All labor, materials, equipment, and supplies necessary for the completion of the entire scope of work as outlined in the contract documents. Includes all associated civil, architectural, structural, plumbing, mechanical, electrical and/or low voltage work as indicated in the Drawings and Specifications. The scope of work includes, but is not limited to; HVAC upgrades to the controls and valves as well as motors and components without the removal of the existing equipment. Removal and replacement of the existing roofing, removal and replacement of the existing ceiling tiles, restroom upgrades, ADA upgrades on the path of travel. Scope includes painting of all interior spaces. Scope of work includes a complete remodel of Room 303. Room will be converted into an Adjunct Faculty Space. Contractor shall include safe-off of all utilities, including but not limited to all electrical, fire alarm, data, security, and plumbing as needed to complete the project scope. SLDBE goal is 20% and DVBE goal is 3%.

Bonds required. Prevailing wages.

Contact

CBS ID: 698717 | Published 2/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.