Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#701175 Posted 3/21/2024

Malaga Wastewater Treatment Plant Nitrogen Reduction Project, Fresno CA

Bid Date
Apr 10, 2024 at 02:00pm
Pre-Bid
Recommended - 3/19/2024 @ 10:00am @ (for location please or )
Owner
Malaga County Water District CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Demolish of DAF basin equipment, furnish and installation of two recirculation pumps, valves, piping, F&I Anoxic Basin submersible mixers, modify blower room air piping, as shown on the plans. The additive alternate scope of work is F&I one recirculation pump, recirculation flow meter, guiderails in aeration basin for future mixers, F&I sludge digester connection pipe, F&I sludge flow meters, F&I influent EC meter, replace sludge digester fill valves as shown on the plans. DBE participation.

Bonds required. Prevailing wages.

Contact

CBS ID: 701175 | Published 3/21/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.