Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#704156 Posted 4/17/2024

Nw Bid Date - MWWTP Blend Tanks Area Odor Control and Degritting Facility Improvements, Oakland CA

Owner Reference
SD-409
Bid Date
Sep 18, 2024 at 01:30pm
Pre-Bid
Pre-Bid Meeting Has Passed - 4/2/2024 @ 01:00pm @ (for location please or )
Estimate
$5.3M - $6.5 Million
Owner
East Bay Municipal Utility District (EBMUD) CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
488 calendar days duration

Description

Must be prequalified. Work includes the following: (1) Demolishing and/or disassembling the existing odor control (x2) and grit removal (x1) systems and re-constructing and re-installing the equipment at their new locations with all new piping, equipment, and appurtenances as shown in the Drawings and Specifications. (2) Install new Class 1 Division 2 wiring, panels, and controls equipment at the flares. (3) install new hardware and improvements at the main gate. (4) install a new concrete slab adjacent to the roadway and odor control system area. Local hiring preference.

Bonds required. Prevailing wages.

Contact

  • Rachel Weber

CBS ID: 704156 | Published 4/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.