#706338 Posted 5/5/2024

REPOST #2 Buildings 004, 005, & 015 HVAC Replacement Project, Turlock, CA

Owner Reference
23-413
Bid Date
Jun 4, 2024 at 02:00pm
Pre-Bid
Mandatory - 5/16/2024 @ 10:00am @ (for location please or )
Estimate
$2,800,000
Owner
California State University Stanislaus (CSUS) CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, C20 - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
388 calendar days

Description

The project consists of replacement of the HVAC systems in three buildings: the Corporation Yard (004), Gymnasium (015), and the Fieldhouse (005). The details for building specific project descriptions are below. Corporation Yard: Existing packaged and split AC systems with either heat pump or natural gas furnace will be removed, as well as selected ductwork. The new HVAC system will be a central station rooftop air handler with chilled water cooling and heating was heating connected to the points of connection provided in Phase 1, which is complete. New ductwork and terminal boxes with reheat will provide zone level temperature control. Two ductless mini split AC units serving data system closets will also be replaced. All air handler and zone level controls shall be incorporated into the existing building management system per plans. Any ceiling work required to provide access for mechanical construction shall be included as generally indicated on the plans. Gymnasium & Fieldhouse: The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls. All new controls shall be connected to the existing systems for control and monitoring by central plant facility staff. Scope of work shall be separated into additive alternate bids, as noted on plans. Pre-qualification required. DVBE goal is 3%.

Bonds required. Prevailing wages.

Contact

CBS ID: 706338 | Published 5/5/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.