Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#709182 Posted 5/29/2024

Systemwide 2 Pipeline Replacement Project - Fremontia Dr & 23rd St 8-inch Water Main Replacement, San Bernardino, CA

Owner Reference
1738
Bid Date
Jul 12, 2024 at 01:30pm
Questions Due By
June 7, 2024 by 4:00pm
Pre-Bid
Mandatory - 6/10/2024 @ 09:00am @ (for location please or )
Estimate
$705,000
Owner
City of San Bernardino CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C34 - Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
180 Calendar Days

Description

Furnish all labor, material, and equipment required to replace existing water mains, install approximately 1,167 linear feet of 8" diameter and approximately 30 linear feet of 6" diameter cement mortar lined ductile iron pipe along with other associated work as shown in the project plans and specifications for Specification No. 1738.

Bonds required. Prevailing wages.

Contact

CBS ID: 709182 | Published 5/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.