Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#710387 Posted 6/10/2024

San Ramon Valley Boulevard Improvements, Danville, CA

Owner Reference
C-600, Fed #STPL-5434(027)
Bid Date
Jun 25, 2024 at 02:00pm
Estimate
$3,698,443.24
Owner
Town of Danville CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
75 working days

Description

The work generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb and gutter, sidewalk, curb ramp, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of hot mix asphalt concrete, removal, removal and replacement of new traffic signal loop detectors, installation of traffic cameras, applying slurry seal Type 2, adjusting to grade of survey monument castings, water valve castings, storm drain and sanitary sewer manhole covers, and other utility lids, removal and replacement of existing pavement striping and markers, traffic control, and other items that are required by the plans, standard specifications, or these Special Provisions. DBE goal is 19%.

Bonds required. Prevailing wages.

Contact

CBS ID: 710387 | Published 6/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.