Work includes surface preparation, surface repair, caulking, sealants, sanding, patching and application of the paint coating to the substrates and systems of Bldg. 80 and associated structures to the building Building 80 houses the Agricultural Sciences classes for Mt. San Antonio College. Constructed in 2011, the 2 story building exterior is approximately 38,000 SQF. The work consists of all preparation for pressure cleaning, caulking/sealing of all cracks, sanding, painting and finishing the exterior surfaces of the building. Exterior painting of building including, but not limited to, all walls, soffits, columns, gutters, downspouts, door and frames, parapet walls, trim, railings, and steel bars where applicable. Without restricting the volume or generality of the above, the work to be performed shall include, but is not limited to the following: Full power wash of the entire building in preparation for paint. All surfaces to be painted must be pressure washed. The exterior surfaces shall be pressure washed to ensure the removal of dirt, mold, mildew, peeling paint chalk/or any other foreign material. Power wash to include any porch and/or entryways if applicable. Remove all signs for proper painting. Replace signs when the painting is completed. Caulk/Seal all gaps/holes/ and/or cracks in the building. Stucco any concrete holes. Sand metal framing. Apply one (1) coat of primer paint, per manufacturer specification, to all surfaces that will be painted. Sand where necessary to ensure proper adhesion of paint to the surface to ensure a smooth appearance. Apply two (2) coats or per manufacturer specification of Sherwin Williams exterior paint to all walls and soffits. Apply two (2) coats or per manufacturer specification of Sherwin William exterior paint to all trims. Apply two (2) coats or per manufacturer specification of Sherwin Williams paint to all doors and railings. Pre-qualification required. Pre-qualification packages due July 18, 2024 by 12:00pm via email to
[email protected] with Bid # & Project Name on the subject line. DVBE goal is 3%.
Bonds required.
Prevailing wages.