Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#713658 Posted 7/12/2024

Street Improvements for Magnolia Street from Edinger Avenue to Heil Avenue, Westminster, CA

Owner Reference
P-2566, Fed #CRAL 5338(054)
Bid Date
Jul 24, 2024 at 10:00am
Estimate
$1,206,000
Owner
City of Westminster CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
60 working days

Description

The project consists of the construction of PCC curb, gutter, cross gutter, sidewalk, driveway approach, and wheelchair ramps with detectable warning surface (truncated dome); removal and replacement of deteriorated pavement areas; cold planning and dispose of existing pavement materials and crack-fill entire street width; placing asphalt rubberize hot mix (ARHM) surface course, adjusting storm drain, MCSD and OCSD manholes, water/fire hydrant valves, and traffic signal boxes to finish grade, installing traffic detector loops, traffic control, signage, striping, pavement markings, curb painting, and all appurtenant work in connection therewith. DBE goal is 7%.

Bonds required. Prevailing wages.

Contact

  • Theresa Tran

CBS ID: 713658 | Published 7/12/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.