This posting has been archived
#739832
•
Posted 1/21/2025
Emergency 36 Inch Transmission Main Replacement Project, Napa, CA
- Owner Reference
- WTR2025-0001
- Bid Date
- Feb 7, 2025 at 03:00pm
- Questions Due By
- January 30, 2025, 5:00pm
- Pre-Bid
- Scheduled, Optional - 1/23/2025 @ 01:00pm @ (for location please or )
- Owner
- City of Napa CA
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera
- Phase
- Contracted Services & Suppliers
Description
The Project generally consists of three phases which Phase II and Phase III may be done concurrently. Each phase is described below. Phase I was already completed in 2023 which installed a 36" valve and bypass in front of Laurel Park. Phase II through IV will be constructed as part of this project. Phase II Robinson Lane and Linda Vista Ave from Browns Valley Road to West Pueblo Ave consists of the following: Remove and replace 3,000 ft of 36-inch AC transmission main with 36-inch steel cement mortar lined and coated transmission main (AWWA C-200). Phase III Laurel Street and Browns Valley Road from Laurel Park to Robinson Lane consists of the following: Remove and replace 3,600 ft of 36-inch AC transmission main with 36-inch steel cement mortar lined and coated transmission main (AWWA C-200). Phase IV Laurel Street from Griggs to Freeway Drive consists of the following: Remove and replace 1,600 ft of 36-inch AC transmission main with 36-inch steel cement mortar lined and coated transmission main (AWWA C-200); Install 2,790 feet of 12-inch C900 distribution main with services; Install 480 feet of 8-inch C900 distribution main with services; Abandon in place 3,270 feet of distribution main with services.
Contact
- Purchasing / Public Works
CBS ID: 739832 | Published 1/21/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.