Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#741966 Posted 2/4/2025

CN 2012 Pine Mountain Tanks Phase 2 Project, Fairfax, CA

Bid Date
Mar 3, 2025 at 02:00pm
Questions Due By
February 20, 2025 at 5:00 PM
Pre-Bid
MANDATORY - 2/14/2025 @ 10:00am @ (for location please or )
Owner
Marin Municipal Water District / Marin Water CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C42 - Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners
Phase
Contracted Services & Suppliers

Description

Description: This contract is for furnishing labor, equipment and materials for the design, construction and commissioning of two 90-foot inside diameter pre-stressed concrete treated potable water storage tanks, yard piping, control systems and final site grading. The Contractor performing work under this contract shall possess a class A Contractor's license which is valid in the State of California at the time the contract is awarded.

Bonds required. Prevailing wages.

Contact

CBS ID: 741966 | Published 2/4/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.