Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#754481 Posted 4/15/2025

West Enos - Kern Fan - Stockdale North Well Drilling and Equipping, Bakersfield CA

Owner Reference
GBJPA 2025-02
Bid Date
May 7, 2025 at 02:00pm
Pre-Bid
MANDATORY - 4/24/2025 @ 11:00am @ (for location please or )
Owner
Eastern San Joaquin County Groundwater Basin Authority CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C57 - Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs
Phase
New Construction, Addition, Expansion

Description

Construction of water wells including drilling, test pumping, concrete foundations for well pumps, equipping new wells including enclosures. Furnishing and installation of shade structures, security structures, electrical services, wiring & controls. Grant-funded from Small Surface Water & Groundwater Storage Projects (SSWGSP), and administered by the US Bureau of Reclamation. The work to be constructed hereunder is located within Kern County, California, in the vicinity of Bakersfield, California, near the intersections of State Route 43 (Enos Lane) and Brimhall Road and State Route 43 (Enos Lane) and Stockdale highway. 1. NEW WELLS WE1, SN1, AND SN2 a. Drilling and construction of three (3) 20-inch diameter (internal diameter of casing) water wells approximately 790 feet deep in the designated recharge ponds areas north of Stockdale Highway and west of State Route 43 (Enos Lane). b. Development of all three (3) wells, including test pumping as specified. c. Construction of three (3) 12’x12’ concrete well pump foundations. d. Equipping of three (3) new wells with 12-inch steel discharge piping assembly, complete with valves, flowmeter, air vents, couplings, and all other appurtenances. e. Furnishing and installation of three (3) well enclosures, one (1) at each well site. f. Furnishing and installation of electrical control panels, including the installation, construction, or provision of concrete pads, shade structures, security structures, electrical service, wiring & controls, and all other appurtenances. 2. EXISTING WELL WE-AG a. Construction of one (1) 12’x12’ concrete well pump foundation. b. Equipping of one (1) existing well with 12-inch steel discharge piping assembly, complete with valves, flowmeter, air vents, couplings, and all other appurtenances. c. Furnishing and installation of one (1) well enclosure at well site. d. Furnishing and installation of electrical control panels, including the installation, construction, or provision of concrete pads, shade structures, security structures, electrical service, wiring & controls, and all other appurtenances. e. all other appurtenances.

Bonds required. Prevailing wages.

Contact

CBS ID: 754481 | Published 4/15/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.