Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#774277 Posted 7/28/2025

Construction & Demolition Facility Napa-Vallejo Waste Management Authority Project, American Canyon, CA

Owner Reference
17810
Bid Date
Aug 26, 2025 at 02:00pm
Questions Due By
August 12, 2025 by 5:00pm
Pre-Bid
MANDATORY - 8/7/2025 @ 10:00am @ (for location please or )
Estimate
$32,000,000
Owner
County of Napa CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The proposed project includes but is not limited to construction of the following items, per the project Plans and Specifications. The scope of work shall include and not be limited to: Mobilization, Clear the site of all vegetation, paving, rubble, and other existing site improvements as indicated, and as required to provide the new Work, Provide and maintain all barricades, fences and other protective devices as required by County ordinances and codes, environmental documents, and as required to protect the public and personnel, for duration of the construction, Perform all excavation, fill, backfill, select fill, Class II AB, concrete, asphaltic concrete, curb and gutter, and other incidental work required to complete the construction as shown on the project plans, Install or extend utilities as required by the project plans, Construct new building structures as shown and specified, Construct new on-site improvements as shown and specified, Construct new off-site improvements as shown and specified, Conduct all other miscellaneous work as shown and specified, and as may be authorized by Owner, Implementation of Stormwater Pollution Prevention Plan (SWPPP), Construction Debris Area Setup and Disposal, Implementation of Erosion and Sediment Control Best Management Practices (BMP), Landscape improvements as shown and specified, Minor concrete curb and gutter repairs, Final cleanup and demobilization, and Project Closeout.

Bonds required. Prevailing wages.

Contact

CBS ID: 774277 | Published 7/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.