Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#776033 Posted 8/5/2025

BID DATE CHANGE: Lafayette Reservoir Tower Safety Upgrade, Oakland, CA

Owner Reference
2175
Bid Date
Oct 22, 2025 at 02:00pm
Pre-Bid
Scheduled, Optional - 8/20/2025 @ 10:00am @ (for location please or )
Estimate
$11,000,000 to $14,000,000
Owner
East Bay Municipal Utility District (EBMUD) CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Mains, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Contracted Services & Suppliers

Description

Addendum 4 changed Bid Date to 10225. Work includes demolishing the upper portion of the tower and shortening it to El. 460 feet; removing the existing manual valve operators for gates; furnishing and installing new operators, slide gates, stems and stem guides and replacing trash racks and fish screens outlets; constructing a new metal control house with crane on top of the remaining tower; retrofitting the west conduit by replacing the entire existing 24-inch ID steel pipe within an existing 60-inch conduit, providing supports as required, and extending the pipe an additional approximately 70 feet to the dewatered tower; retrofitting the east conduit by furnishing and installing and encasing a new 36-inch ID steel pipe and supports within the existing 60-inch conduit; and performing related required work.

Contact

  • Ben Townley

CBS ID: 776033 | Published 8/5/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.