Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#777386 Posted 8/12/2025

Upper Harris Branch Wastewater Interceptor - Phase 1, Austin, TX

Owner Reference
IFB 6100 CLMC1132
Bid Date
Sep 25, 2025 at 02:00pm
Pre-Bid
Scheduled, Optional - 8/12/2025 @ 10:00am @ (for location please or )
Estimate
$28,681,030.00
Owner
City of Austin TX
Trades
Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, Tree Service Contractor: Planting/Trimming/Pruning Trees, Stump Removal/Rooting/Tub Grinding, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Construction Zone Traffic Control Contractor, Flashing Beacons
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Approximately 10,700 LF of 36- and 42-inch gravity line will begin at the eastern portion of the Service Extension Request at 3981 Pioneer Crossing site and will tie into the Lower Harris Branch Interceptor. This project will allow relief of the Yager Lane Lift Station. This project will coordinate with subproject 4769.022, which will construct the remaining interceptor and the tie-in for the Dessau Wastewater Treatment Plant, respectively. Due to the location along Harris Branch Creek and TxDOT roads, portions of this interceptor will require microtunnelling and bores.

Bonds required. Prevailing wages.

Contact

CBS ID: 777386 | Published 8/12/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.