Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#778657 Posted 8/19/2025

Immanuel 111 Offsite Utility Improvements Phase 2, Austin, TX

Owner Reference
IFB 6100 CLMC1131
Bid Date
Sep 25, 2025 at 02:00pm
Pre-Bid
Scheduled, Optional - 8/28/2025 @ 09:00am @ (for location please or )
Estimate
$14,210,961.00
Owner
City of Austin TX
Trades
Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, Road Improvements: Parking & Highway Improvements; Roundabout, Median Construction - NAICS 237310, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Approximately 4,000 feet of 36-inch water transmission main along E Howard Ln and Fish Ln, 3,900 feet of 24-inch water main along Dessau Rd and Crystal Bend Dr, and 1,135 feet of 24-inch wastewater interceptor along Crystal Bend Dr.

Bonds required. Prevailing wages.

Contact

CBS ID: 778657 | Published 8/19/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.