Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#781378 Posted 9/2/2025

Constructing the Southeast Recharge Pipeline, Wasco, CA

Owner Reference
25-01
Bid Date
Sep 25, 2025 at 02:00pm
Questions Due By
9/18/2025 by 5 pm
Pre-Bid
MANDATORY - 9/8/2025 @ 09:00am @ (for location please or )
Owner
Shafter-Wasco Irrigation District CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Contracted Services & Suppliers

Description

While the work is more fully described and detailed in the Plans and Specifications, it includes the following: removal and disposal of approximately 830' of 15” A.C. pipeline and associated fittings; installation of approximately 900' of 18” C900 PVC pipeline and associated fittings; installation of 18” flowmeter and access vault; installation of pipeline turnouts; and construction of a portion of future pond levees.

Bonds required. Prevailing wages.

Contact

CBS ID: 781378 | Published 9/2/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.