Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#781448 Posted 9/3/2025

Development Project Support Services Lakeside at Sutter Pointe Building Permit Plan Check and Site Inspection, Yuba City, CA

Owner Reference
RFP.LASP.CS.Building1
Bid Date
Sep 16, 2025 at 03:00pm
Owner
County of Sutter CA
Trades
Building Inspector, Building Official, Plans Reviewer, Permits, Building Codes & Code Compliance
Phase
New Construction, Addition, Expansion

Description

PROJECT DESCRIPTION The Lakeside at Sutter Pointe Plan Concept includes the following phases: Phase 1 of the Lakeside project includes 386.2 acres in the southerly portion of the Recreational Village including the Lake Neighborhood envisioned in the village (see Attachment 6). Phase 1 will include 1,273 dwelling units, including 1,082 single family lots ranging in size from 45’ x 90’ lots to 70’ x 110’ lots, and 191 medium density cluster homes. The Lake Neighborhood will include two lakes totaling 31.1 acres with a paved pedestrian lake walk with mini parks around the entire larger lake. A 2.6-acre clubhouse lot and a 1.5-acre park is proposed near the entrance to the neighborhood. A 13.2-acre community park is proposed north of the lake on the west side of the project area which could be enlarged to the size of a regional park when a development project is proposed to the west of Lakeside. On the east side of the neighborhood, a 4.5-acre park is proposed as well as connections to the open space trail along Natomas Road (once it is closed to vehicles). Phase 1 will also include a portion of the East Activity Center with a 26.8-acre Employment Center lot, an 8.9-acre Commercial Center lot, and a 10.3-acre high density 3 residential lot with 193 units. This 46-acre mixed-use node could be used for a regional/ institutional use, such as community college, vocational school, or hospital, if such a user is found. Five lots for utility sites totaling 5.2 acres and 30.2 acres of major roadways are included in Phase 1. Phases 2 and 3 of the Lakeside project are anticipated to include an active adult neighborhood focused around an 8.2-acre lake and a 13.1-acre linear parkway with two 1-acre mini parks. Phases 2 and 3 propose 1,985 single family homes with 132 medium density cluster homes and a 11.1-acre high density residential lot with 206 units. On the east side of Phases 2 and 3 a 16.0 acre elementary school (K-8) with a 4.4-acre adjacent park is proposed. The school site has an underlying MDR zone and is shown on Attachment 4- Rezone Exhibit with a cross hatch pattern. A 16.1-acre commercial lot, a 18.0-acre employment center lot and the 11.1-acre high density residential lot originally planned to be included in the East Activity Center along Riego Road are proposed to be relocated north to be closer to the future North Activity Center along Sankey Road (future Placer Parkway).

Prevailing wages.

Contact

CBS ID: 781448 | Published 9/3/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.