This posting has been archived

#792535 Posted 10/29/2025

Stevenson Bridge Road Bridge Rehabilitation Project BRLS 5923 (059), Fairfield, CA

Bid Date
Nov 21, 2025 at 02:00pm
Pre-Bid
MANDATORY - 11/6/2025 @ 10:00am @ (for location please or )
Estimate
10,200,000
Owner
County of Solano CA
Trades
Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, Other Foundation, Structure, & Building Exteriors NAICS 238190, C8 - Concrete Contractor: Pavement, Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps Pedestrian Improvements, CIP Concrete NI, C61/D49 - Tree Service Contractor: Planting/Trimming/Pruning Trees, Stump Removal/Rooting/Tub Grinding, D56 - Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, C12 - Earthwork & Paving Contractor: Road Resurface, Seal Coat, High Friction Treatment, Milling, Asphalt, Land Clearing, Trails/Path
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
230 working days

Description

General Work Description: The Stevenson Bridge Road Bridge Rehabilitation Project is located approximately 8 miles north of Dixon, California. The project involves retrofitting the existing bridge, performing foundation upgrades, and improving the roadway approaches. The retrofit work includes carbon fiber wrapping of the arch, portal, vertical, and pier members; installation of reinforced concrete girders and abutment bolsters; replacement of tie girder prestressing tendons; removal and patching of unsound concrete; epoxy injection of larger cracks; and removal of the existing concrete deck surface followed by placement of a polyester concrete overlay. Foundation work consists of installing new 2.2-meter cast-in-drilled-hole (CIDH) piles at each support, concrete footing encasement, and construction of a permanent access road from the top of the north east bank to the bottom of the channel. Roadway approach work includes tree removal, grinding and removal of the existing asphalt concrete surface, grading, and construction of approximately 800 linear feet of new roadway

Prevailing wages.

Contact

CBS ID: 792535 | Published 10/29/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.