This posting has been archived
Water System Reliability Project - Water Storage Tank, Ancillary Facilities, Well No. 5 Improvements and Pipeline Connections, Visalia CA
- Bid Date
- Dec 18, 2025 at 02:00pm
- Pre-Bid
- Encouraged - 11/3/2025 @ 11:00am @ (for location please or )
- Owner
- London Community Services District CA
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C57 - Water Well Construction, Watershed Improvements & Water Tables Aquifer Storage, Drilling, Installation & Repairs
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 275 days completion
Description
Construction of improvements to an existing municipal water well (Well No. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, PG&E new service installation/connection and Well No 1 destruction.
Bonds required. Prevailing wages.
Contact
- James Blair
CBS ID: 796873 | Published 11/22/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.