PW - 100995-3 - Lake Arlington Force Main - Part 3, Fort Worth, TX
- Owner Reference
- 26-0073
- Bid Date
- Jan 29, 2026 at 02:00pm
- Questions Due By
- Jan 22nd 2026, 2:00 PM CST
- Pre-Bid
- Scheduled, Optional - 1/13/2026 @ 09:00am @ (for location please or )
- Owner
- City of Fort Worth TX
- Trades
- Pipeline Contractor: Water Mains, Sewer Mains, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging, Filing, Stormwater Drainage: Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Rodding, French Drains, Dewatering, Water Swales, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
Description
The major work will consist of the (approximately) following: • 326 LF of 42-inch FRP Sewer Line by Open-Cut • 109 LF of 51-inch FRP Sewer Line by Open-Cut • 156 LF of 72-inch FRP Sewer Line by Open-Cut • 175 LF of 72-inch FRP Sewer Line in 96-inch (0.844” Min Thickness) Steel Casing by Auger Bore/Tunnel Liner Plate by Hand Tunneling • Sewer Junction Structures (Chesterton or Warren Environmental Corrosion Protection Liner) • Concrete Manholes (Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal) • Epoxy Liner • Odor Control Units.
Bonds required. Prevailing wages.
Contact
- Purchasing
- [email protected]
CBS ID: 802046 | Published 1/4/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.