This posting has been archived
2025-121 HWY 80 Utility Project IFB, San Marcos, TX
- Owner Reference
- 2025-121
- Bid Date
- Feb 12, 2026 at 03:00pm
- Pre-Bid
- Scheduled, Optional - 1/20/2026 @ 02:00pm @ (for location please or )
- Estimate
- $22,247,000.00.
- Owner
- City of San Marcos TX
- Trades
- Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Mains, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
Description
Project Scope: The scope of the project includes but is not limited to construction of a new 6.5 MGD lift station facility, approximately 11,600 LF of 18” wastewater force main, and approximately 11,700 LF of 24” reuse water line.
Bonds required. Prevailing wages.
Contact
- Sara Robertson
- [email protected]
CBS ID: 803760 | Published 1/13/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.