This posting has been archived
Vybe Trail: Kyle Marketplace Section Two - St. David Connector Segment, Kyle, TX
- Owner Reference
- IFB-2026-064
- Bid Date
- Apr 21, 2026 at 03:00pm
- Questions Due By
- April 7, 2026, 5:00pm
- Pre-Bid
- Scheduled, Optional - 4/6/2026 @ 02:30pm @ (for location please or )
- Owner
- City of Kyle
- Trades
- Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
Description
The Work consists of more than 1,000LF of concrete trail, 270LF of Sidewalk connector segment, and includes the installation of a 150LF pre-manufactured pedestrian bridge. The alternate bid items consist of an additional 200+LF off trail with associated infrastructure.
Bonds required. Prevailing wages.
Contact
- Dan Dellemonache
- [email protected]
CBS ID: 818752 | Published 4/13/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.