Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#818752 Posted 4/13/2026

Vybe Trail: Kyle Marketplace Section Two - St. David Connector Segment, Kyle, TX

Owner Reference
IFB-2026-064
Bid Date
Apr 21, 2026 at 03:00pm
Questions Due By
April 7, 2026, 5:00pm
Pre-Bid
Scheduled, Optional - 4/6/2026 @ 02:30pm @ (for location please or )
Owner
City of Kyle
Trades
Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

The Work consists of more than 1,000LF of concrete trail, 270LF of Sidewalk connector segment, and includes the installation of a 150LF pre-manufactured pedestrian bridge. The alternate bid items consist of an additional 200+LF off trail with associated infrastructure.

Bonds required. Prevailing wages.

Contact

CBS ID: 818752 | Published 4/13/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.