Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#819930 Posted 4/20/2026

Riverside Drive Slope Protection, Fort Worth, TX

Owner Reference
26-095
Bid Date
Apr 29, 2026 at 01:00pm
Questions Due By
April 27, 2026, 12:00pm
Pre-Bid
Scheduled, Optional - 4/22/2026 @ 11:00am @ (for location please or )
Estimate
$600,000
Owner
Tarrant Regional Water District (TRWD)
Trades
Rock Slope Construction Mitigation & Stabilization, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls, Aggregate & Rock Crushing Services, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Sand Bags, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Work is described in general, non-inclusive terms as: Concrete slope protection adjacent to the Fort Worth Trinity Trail under the Riverside Drive bridge along the West Fork Trinity River. Concrete key walls along the perimeter of concrete slope protection with rock riprap toe protection placed at the bottom of the bank. Vegetated rock riprap bank protection upstream and downstream of concrete slope protection. Handrail foundation along the top of bank and widening of the existing trail under the bridge.

Bonds required. Prevailing wages.

Contact

CBS ID: 819930 | Published 4/20/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.