This posting has been archived
Specifications for Self-supporting Poles Upgrade Utility Protective Measures, Phase 2 Construction, Tavernier, FL
- Owner Reference
- 26-07
- Bid Date
- Apr 22, 2026 at 02:00pm
- Questions Due By
- 4/13/2026 5:00 PM
- Owner
- Florida Keys Electric Cooperative (FKEC)
- Trades
- CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Structural Steel & Steel Erection Contractor, Poured Concrete / Polymer: Pier and Beam Foundation Contractor
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
Florida Keys Electric Cooperative (FKEC) is seeking proposals to provide hazard mitigation for the replacement of eleven (11) guyed transmission structures with steel self-supported structures and concrete drilled pier foundations. These structures range in location from Key Largo (Card Sound), Florida to Marathon, Florida with four (4) being on land and seven (7) located in the water. Please see Bid Package for complete details.
Bonds required.
Contact
- Purchasing
- [email protected]
CBS ID: 820157 | Published 4/21/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.