This posting has been archived
Marina Pumping Plant No. 2 Force Main Upgrades, Long Beach, CA
- Owner Reference
- 03-P-0063
- Bid Date
- Apr 28, 2026 at 02:00pm
- Estimate
- $880,000 - $ 1,320,000
- Owner
- Los Angeles County Sanitation District (LACSD)
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF)
- Phase
- Contracted Services & Suppliers
- Duration
- 200 Working Days
Description
The project will replace the existing 10- and 12-inch ductile iron pipe (DIP), steel, and cast-iron pipe (CIP) comprising Force Main No.1 with a 12-inch diameter high-density polyethylene (HDPE) force main inside an 18-inch diameter steel casing. The project will rehabilitate Force Main No. 2 with a pressure-rated cured-in-place pipe (CIPP) liner and 2 manholes with a protective coating system, along with all appurtenant work.
Bonds required. Prevailing wages.
Contact
- Mathew Watson
- 1620
- [email protected]
CBS ID: 820801 | Published 4/24/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.