Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#820801 Posted 4/24/2026

Marina Pumping Plant No. 2 Force Main Upgrades, Long Beach, CA

Owner Reference
03-P-0063
Bid Date
Apr 28, 2026 at 02:00pm
Estimate
$880,000 - $ 1,320,000
Owner
Los Angeles County Sanitation District (LACSD)
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, C42 - Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF)
Phase
Contracted Services & Suppliers
Duration
200 Working Days

Description

The project will replace the existing 10- and 12-inch ductile iron pipe (DIP), steel, and cast-iron pipe (CIP) comprising Force Main No.1 with a 12-inch diameter high-density polyethylene (HDPE) force main inside an 18-inch diameter steel casing. The project will rehabilitate Force Main No. 2 with a pressure-rated cured-in-place pipe (CIPP) liner and 2 manholes with a protective coating system, along with all appurtenant work.

Bonds required. Prevailing wages.

Contact

CBS ID: 820801 | Published 4/24/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.