Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#821247 Posted 4/28/2026

Emergency final costs for Sinnissippi Dam stop logs purchase, Springfield, IL

Owner Reference
26-422DNR-DIREC-B-51885
Bid Date
Apr 30, 2026 at 01:00pm
Owner
State of Illinois Department of Natural Resources
Trades
*General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Reinforcing Bar Contractor: Reinforcement Steel Contractor; Wire Mesh, Steel Mesh, Rebar, Rods
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Emergency Final Costs for the completed emergency project of purchasing 4 additional stop logs so they can be placed upstream of Gate 3 of Sinnissippi Dam in Rock Falls, IL. to stop the flow of water through the flow of water through the gate. This will allow the IDNR to maintain the upstream pool elevation at the required elevation until the gate can be examined and a permanent repair is made. This will allow the IDNR to maintain the upstream pool elevation at the required elevation until the gate can be examined and a permanent repair is made.

Contact

CBS ID: 821247 | Published 4/28/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.