This posting has been archived
FY2027 Roadway Improvements, Shrewsbury, MA
- Bid Date
- May 12, 2026 at 01:00pm
- Owner
- Town of Shrewsbury
- DBE Goal
- MBE: 5%; WBE: 5%
- Trades
- Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- New Construction, Addition, Expansion
- Duration
- 180 calendar days
Description
The Town of Shrewsbury invites sealed bids for FY2027 Roadway Improvements. The scope of work is as follows: the mill and overlay of approx. 33,500 s.y. of roadways known as Oak St, Alice Ave, Ruthen Cir, Prospect St, Round Table Rd, Sword St, and Guinevere Cir. Work also includes the full depth reclaim/repave of two streets totaling approx. 18,100 s.y., known as Saxon Lane and Keyes House Rd. Also included is the replacement of 36 WCR/CCs, approx. 46 catch basins, 2 DMHs, a leaching catch basin, associated frames, covers and HDPE drainage pipe. All Contractors must be pre-qualified through the Massachusetts Department of Transportation with the class of work as PAVEMENT SURFACING with an estimated value of $2,172,804.34.
Bonds required. Prevailing wages.
Contact
- Jeff Goodwin
- [email protected]
CBS ID: 821393 | Published 4/28/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.