This posting has been archived
Johnson Property Remediation, Stanwood, WA
- Bid Date
- May 12, 2026 at 02:00pm
- Questions Due By
- May 8 at 2pm
- Estimate
- $280,000 - $345,000
- Owner
- City of Stanwood
- Trades
- Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 20 working days
Description
The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for mobilization to the site; site preparation; excavation and disposal or recycling of soils contaminated with petroleum; excavation, removal, and disposal of a 300 gallon abandoned underground storage tank (UST); excavation, removal, and disposal of septic tank and attached lines within the excavation zone of the UST; excavation of overburden soils from areas of contaminated groundwater and stockpile for later use; as needed dewatering and treatment of water from excavation locations to improve excavation stability; mixing of bioremediation reagents into the 2-feet of soil at the bottom of the remediation locations; and backfilling the excavations with stockpiled overburden soils, salvaged soils, or approved import material and associated project restoration.
Bonds required. Prevailing wages.
Contact
- Alan Lytton
- [email protected]
CBS ID: 821396 | Published 4/28/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.