#821520 Posted 4/29/2026

Ground Storage Tank No. 2 Replacement at Water Plant No. 2 and Water Plant Improvement, Katy, TX

Owner Reference
05133-0236-01
Bid Date
May 1, 2026 at 10:00am
Pre-Bid
Scheduled, Optional - 4/14/2026 @ 09:30am @ (for location please or )
Estimate
$2,877,000
Owner
Grand Mission MUD1 Municipal Utility District
Trades
Wastewater Treatment Plant/Facility Construction: Septage, WWTP/WRF/OSSF OnSite Sewage Treatment Station, Lift Station, Tank & Silo Construction & Controls, Maintenance, Inspections, Repair & Cleaning, Pressure Washing, Pressure Washing Contractor: Sand & Water Blasting, Hydroblasting, Power Washing Services, Graffiti Removal, Industrial Painting & Coating Contractor: Tanks, Bridges, Corrosion Protection, Pipeline Contractor: Water Mains, Sewer Lines, Septic Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Water Plant No. 1: The work includes but is not limited to: Blasting and recoating aboveground piping and valves of Ground Storage Tank No. 3 (constructed in 2013); blasting and recoating of the exterior of Hydropneumatic Tank No. 2 (constructed in 2006) including aboveground piping and valves. Water Plant No. 2: The work includes but is not limited to: Blasting and recoating aboveground piping and valves of Ground Storage Tank No. 1 (constructed in 2008); removal and replacement of the 428,000-gallon galvanized bolted Ground Storage Tank No. 2 (constructed in 2008) with a 350,000-gallon prestressed concrete ground storage tank including foundation, piping modification, electrical integration/modifications, and associated site modifications to accommodate the new tank; touch-up coating the exterior of Hydropneumatic Tank No. 1 (constructed in 2008); replacement of Booster Pump Nos. 1 and 2 with new 1,250 gpm, 75 hp split-case booster pumps including electric motors, discharge heads, and factory tests. Water Plant No. 3: The work includes but is not limited to: Blasting and recoating the interior and exterior of Hydropneumatic Tank No. 1 (constructed in 2016) including aboveground piping and valves; touch-up coating of the exterior of Hydropneumatic Tank No. 2 constructed in 2020.

Bonds required. Prevailing wages.

Contact

CBS ID: 821520 | Published 4/29/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.